Floors: 6
Elevator: Yes
Apartments: 116
We present a new, gated complex in Krustova Vada district with excellent location.
The complex is within walking distance of South Park, Paradise Mall and Vitosha Metro Station. For the convenience of the owners is provided a large landscaped area with places for relaxation, playground and outdoor fitness. The complex will have a well-developed infrastructure, with underground parking on 2 levels.
The architecture is modern, in harmony with the environment. The structure of the building is intended to be monolithic-skeletal, reinforced concrete, calculated for earthquakes according to the latest European standards.
The exterior walls are with Wineberger ceramic blocks, 25 cm thick and 10 cm outer insulation according to the new thermal engineering requirements.
Technical specification
The facade of the building will be completed according to the project with stone facing on the ground floor and a combination of plaster and decorative elements. The common parts of the building will be finished luxuriously as follows:
- Security door with access control and chip and video door intercom
- Security and CCTV room
- Entrance hall, staircase and elevator - down to the basement
- Granite flooring
- Orona Spanish Elevator
- French fiberglass wallpapers
- Staircase aluminum railings
The apartments are planned to be completed in the following stages:- Cement flooring
- Gypsum plaster - on walls and ceilings
- PVC five-chamber exterior joinery with "K" glass
- Entrance armored door
- Fully Built El. Installation with switches, sockets and sockets (by design)
- Wiring for security systems Water supply and sewerage system - on the plug
- The heating is provided with aluminum, Italian radiators and pipes passing on the floor - to the gas boiler, which everyone will buy according to their preferences.
All external connections will be established, namely:
- Power supply
- Gas supply
- Water supply and connection to external sewers
- Opportunity for internet and wire services from a provider of your choice (via a pipe left for providers to provide connection)
Payment
Option 1
- 1st installment - 40% upon signing a preliminary contract;
- 2nd installment - 30% under Act 14
- 3rd installment - 20% under Act 15
- 4th installment - 10% under Act 16
Option 2
- 1st installment - 60% upon signing a preliminary contract;
- 2nd installment - 20% under Act 14
- 3rd installment - 10% under Act 15
- 4th installment - 10% under Act 16
Option 3
- 1st installment - 30% upon signing a preliminary contract;
- 2nd installment - 30% under Act 14
- 3rd installment - 30% under Act 15
- 4th installment - 10% under Act 16
Features
- Under construction
- Leasing
- Elevator
- Garage
- Parking
- Security
- Playground